设计EngineerGE Power India Ltd·Full-timeJan 2016 – Present7 yrs 8 mosNoida, UP, IndiaProject – 2x660 MW supercritical turbine islands for the Tanda coal power plant (~ 10 months) Project – 2x880 MW supercritical turbine islands for the Telangana-II coal power plant (~ 8 months) Project – 3x660 MW Ghatampur thermal power project (~ 6 months) Project – 2x660 MW Obra ‘C’ thermal power extension project (~ 6 months) Project – 2x660 MW Jawaharpur super thermal power station (~ 6 months) Overseas Project – Hanhikivi, Akkuyu, Wylfa, Paks II Job responsibilities: Worked on static equipment like high & low-pressure feedwater heaters & surface condenser for several supercritical power plant projects of clients like NTPC, Doosan, state electricity board, etc. as a mechanical design engineer. Superior proficiency with CATIA V5 Design suite. Major responsibilities included preparation of customer documents like datasheets, arrangement drawings, defining erection philosophy and manufacturing documents (drawings, models, and BOM) for high & low-pressure feedwater heaters & surface condenser. Managed development of PLM & PDM system and internal CAD data. Working on RE data and scan data. 3D modeling & provide manufacturing documents. Familiar with international codes like ASME Sec-VIII Div-1, ASTM, ASME B16.5, B36.10M, B16.9, Y14.5, HEI, TEMA. Preparing fabrication drawings as per company norms and using standard.
设计EngineerHARYANA GLOBAL LTD·Full-timeMay 2014 – Dec 20151 yrs 7 mosFaridabad, HR, IndiaDeveloped the complex profile of ‘Blade’ of steam and gas turbine engine Worked on aerospace equipment manufacturing technologies like Disc, body, Blades, Frames, different engine parts, turbine blade, etc. for several military aircraft like MiG-21, MiG- 29, Sukhoi Su- 30MKI, etc. of the client like “Hindustan Aeronautics Ltd.” as a mechanical design engineer. Assisted in developing the design and drafting for manufacturing processes Modified existing format models and drawings to change notice requirements. Closely work with the quality team to prepared correct quality documents & also provide a checking method for critical aerospace parts, developed different types of checking gauges. Improved designs based on prototype testing Capability to handle model conversion from supplier drawings Handled project and facility management related design and drafting tasks Handled the job of checking and correcting the complete Bill of Materials (BOM) of a machine before it is released for manufacturing Responsible for establishing the specifications for material procurement and play an active role in helping the purchase dept. in developing these new materials
Education
University of Delhi学士,物理,22007 – 2010Activities and Societies: Vice president of Physics Society, Playing Cricket, Basketball, and athlete.