Global rank:
3,085/ 67,928
Skill pts:8
Hire / Invite to Project

About

I'm a Design Engineer (Piping, Pressure Vessels, Tanks, Skid Mounted Packages, Containers), Having a Solid Experience in:-

* Piping Design, Drafting and 3D Modeling acc. to ASME B31.3, ASME B31.4 using E3D, Autocad 3D Plant, Solidworks (Routing) Softwares.

* Pressure Vessels Design (3 Phase Separators, Heater Treater, Scrubbers, and Gas Strippers) acc. to ASME VIII div.1, using PV Elite, Solidworks Softwares.

*Tanks Design (Vertical and Horizontal) acc. to API 650 & BS 2594 using AMETANK Software.

*Offshore Containers, Lifting Frame and Skid Mounted Packages acc. to DNV 2.7-1 , DNV 2.7-3 using Staad Pro, and Tekla Softewares.

Prepare:-
1/ 3D Model.
2/ Shop & Fabrication Drawings.
3/ Isometrics Drawings, As-Built Drawings.
4/ Piping General Arrangement (GAs).
5/ Mechanical Calculations Notes.
6/ Bill of Materials. (BOM)
7/ Equipment & Line Lists.

Activities:-
1/ Doing Field survey.
2/ Reviewing Technical Bid Requirements, specifications and documents of different disciplines.
3/ Making Technical Bids Evaluation.
4/ Attending 3D Model Review Sessions (hidden)%, (hidden)%, (hidden)%)
5/ Attending HAZOP, HAZID, SIL Sessions.
5/ Meetings with the Customer.
6/ Client Counseling in English and Arabic Languages.

I have proficiency in Softwares such as E3D, AutoCad 3D Plant, AutoCad 2D, Solidworks, PV Elite, AME Tank, Staad Pro, Tekla Structure

hereinafter, Portfolio, it's pleasure to have a look on it.

Experience

  • 管道设计工程师ASORC·Full-timeJun 2023 – Present4 mosundefined, EgyptActivities:-
    1/ Executing Management of Change (MOC) for New/Modified Piping Systems.
    2/ Doing Field / Site survey.
    3/ Preparing Technical Bid Requirements, Specifications and Documents and submit it to Bidders.
    4/ Reviewing Vendors / Contractors Technical / Commercial Offers.
    5/ Making Technical Bids Evaluation.
    6/ Attending 3D Model Review Sessions (hidden)%, (hidden)%, (hidden)%)
    7/ Attending HAZOP, HAZID, SIL Sessions.
    8/ Meetings with the Vendors / Contractor.
    9/ Follow Up Execution of Projects, and compliance with ASME / API Standards.

    Prepare:-
    1/ 3D Model.
    2/ Shop & Fabrication Drawings.
    3/ Isometrics Drawings, As-Built Drawings.
    4/ Piping General Arrangement (GAs).
    5/ Mechanical Calculations Notes.
    6/ Bill of Materials. (BOM)
    7/ Equipment & Line Lists.
  • Technical office engineerPower House Egypt·Full-timeMar 2018 – Present5 yrs 7 mosundefined, Egypt

Education

  • Assuit UniversityBach. of Mechanical Engineering, Mechnical Engineering, 3.0 GPA2012 – 2017