专业经验:威德福国际有限公司高级项目工程师2012年6月至今管理项目,确保活动按照既定的规范、时间表和预算进行;协调部门间职能,以尽量减少延误;定期与项目团队成员会面,回顾项目状态并计划未来行动。协调各职能部门的工作,确保项目按照需求说明书和预算进行;从制造到生产。o通过设计师和制造商之间的直接联系,提高效率,维护测试时间表,同时更新实验室报告,将上市时间缩短了三倍。与有限元工程师,设计师和机械师协商,以提高产品设计,同时限制制造可扩展连接产品线的难度。与内部和外部客户就计划、会议和项目状态进行沟通。预测潜在的进度或优先级延迟,并启动替代行动计划。设计和监控产品、夹具和其他实验室操作专用设备的制造。 o Capehart, Michael B. and Richard W. Delange, Feng Gao, Scott H. Osburn, John Richard Setterberg, Jr. “Expandable Liner.” Patent Application No. PCT/US(hidden)/(hidden), filed July 13, 2016. L3 Communications PID Waco, TX Structural Engineer 2B September 2008 - June 2012 Analyzed interior and exterior aircraft components that were newly designed or modified. Then, conveyed results to the design group to aid in obtaining structurally sound components per customer requirements. ● Performed stress analysis for interior and exterior aircraft components on various aeronautical programs and detailed results in a professional report format. o Performed static stress analysis on the addition of an antenna to the outer skin of aircraft fuselage. o Utilized Finite Element Analysis (FEA) to achieve optimal design for the critical clevis attachment of a 1200+ lbm to the aircraft frame. ● Proactively programmed spreadsheets to generate analysis of common parts and output results into proper report format. ● Coordinated with design groups to update parts according to results of stress analysis. ● Worked with manufacturing, purchasing and test sites to coordinate completion of test samples. o Prepared all component level test plans and report for P(hidden)+ total). o Analyzed effects of large payload attached to critically stressed components of the wingbox. Professional Honors: Engineer-In-Training (EIT 54943) “Expandable Liner”. US Patent Application No. PCT/US(hidden)/(hidden). (hidden) July 13 Society of Petroleum Engineering American Society of Mechanical Engineers